Wuhai Olympic Sports Center

Project

Wuhai Olympic Sports Center

Wuhai Olympic Sports Center

CONTACT US

    * Name

    *Email

    Phone / WhatsAPP / WeChat

    * What I have to say.


    Related Products

    Expandable container

    Expandable container

    1. Roof and floor is finished.   2. Windows and doors are preinstalled on the wall panels. &...

    Shanxi Aluminum Ore Yard Enclosure Project

    Shanxi Aluminum Ore Yard Enclosure Project

    Project scale: 260m in length and 80m in width   Building area: 20,800m²   Project loca...

    BAPV standing seam colored steel sheet roofing system

    BAPV standing seam colored steel sheet roofing system

    BAVP (Building Attached PV), is a technology that installs a solar photovoltaic power generation system on the roof of an existing building. It not only has a photovoltaic power generation project but can also preserve the original building structure to the greatest extent. Advantages of BAPV Roof: There is no need to change the original roof structure. It is convenient to install and has a strong load-bearing capacity. The investment cost of some photovoltaic components is low. It has stronger heat preservation and insulation capabilities.

    CLP voted Huolinhe 200000 tons of coal storage bunker

    CLP voted Huolinhe 200000 tons of coal storage bunker

    Inner diameter 128m, height 69m   The capacity is the biggest in Asia. The project gained Ch...

    TG Building of IND-BARATH Power Plant

    TG Building of IND-BARATH Power Plant

    The project is located in the northern part of Sambalpur City, Odisha, India, with a multi – storey steel structure frame system.

    Flat pack container

    Flat pack container

    1. Roof and floor is finished.   2. Windows and doors are preinstalled on the wall panels. &...

    Wangpo Coal Mine 80m-span Grid Truss Trestle in Jincheng

    Wangpo Coal Mine 80m-span Grid Truss Trestle in Jincheng

    The single span of this trestle project reaches 80 meters, which is the largest span among similar trestles in China. It has a double-belt and double-layer grid truss structure.

    Xinjiang Coal Yard Gas Membrane Shed Reconstruction Project

    Xinjiang Coal Yard Gas Membrane Shed Reconstruction Project

    Project scale: 290m in length and 110m in width   Building area: 31,900m²   Project loc...

    Home
    Products
    About Us
    Contacts

    Please leave us a message

      * Name

      *Email

      Phone / WhatsAPP / WeChat

      * What I have to say.