1. Roof and floor is finished.
2. Windows and doors are preinstalled on the wall panels.
3. Electric wires are installed in roof structure, the DB box with breakers and A/C outlet are installed on ceiling already. Outlet are installed on the wall panels, just need connect electric wires at site.
4. workers can assemble one unit within 1 hour.