Flat pack container

Project

Flat pack container

1. Roof and floor is finished.

 

2. Windows and doors are preinstalled on the wall panels.

 

3. Electric wires are installed in roof structure, the DB box with breakers and A/C outlet are installed on ceiling already. Outlet are installed on the wall panels, just need connect electric wires at site

 

2 workers can assemble one unit within 1 hour.

2024319102146982
6384644050200660179334505

CONTACT US

    * Name

    *Email

    Phone / WhatsAPP / WeChat

    * What I have to say.


    Related Products

    Main Workshop of Yitai Ordos 160,000 Ton Indirect Coal Oil Project

    Main Workshop of Yitai Ordos 160,000 Ton Indirect Coal Oil Project

    The project is located in the northern part of Sambalpur City, Odisha, India, with a multi – storey steel structure frame system.

    Xinjiang Coal Yard Gas Membrane Shed Reconstruction Project

    Xinjiang Coal Yard Gas Membrane Shed Reconstruction Project

    Project scale: 290m in length and 110m in width   Building area: 31,900m²   Project loc...

    Home
    Products
    About Us
    Contacts

    Please leave us a message

      * Name

      *Email

      Phone / WhatsAPP / WeChat

      * What I have to say.