Office Building Project of Jiangsu Jinding Boiler

Project

Office Building Project of Jiangsu Jinding Boiler

Office Building Project of Jiangsu Jinding Boiler (1)
Office Building Project of Jiangsu Jinding Boiler (2)
Office Building Project of Jiangsu Jinding Boiler (3)

CONTACT US

    * Name

    *Email

    Phone / WhatsAPP / WeChat

    * What I have to say.


    Related Products

    The main workshop of the coal preparation plant of Huozhou Coal Electricity Group

    The main workshop of the coal preparation plant of Huozhou Coal Electricity Group

    This project is the steel structure main workshop of the coal preparation plant, which is a multi-storey frame structure and the world’s largest coking coal washing system, with a construction area of 46,000 square meters.

    Flat pack container

    Flat pack container

    1. Roof and floor is finished.   2. Windows and doors are preinstalled on the wall panels. &...

    A flexible and practical framework system

    A flexible and practical framework system

    The sturdy, durable, flexible and practical framework system, the China Coal Steel Structure Framework System, can provide customers with a variety of economical and practical options. It has met the requirements of various buildings for different purposes.

    Wangpo Coal Mine 80m-span Grid Truss Trestle in Jincheng

    Wangpo Coal Mine 80m-span Grid Truss Trestle in Jincheng

    The single span of this trestle project reaches 80 meters, which is the largest span among similar trestles in China. It has a double-belt and double-layer grid truss structure.

    Home
    Products
    About Us
    Contacts

    Please leave us a message

      * Name

      *Email

      Phone / WhatsAPP / WeChat

      * What I have to say.