Foldable Container house

Project

Foldable Container house

1. Roof and floor is finished.

 

2. Windows and doors are preinstalled on the wall panels.

 

3. Electric wires are installed in roof structure, the DB box with breakers and A/C outlet are installed on ceiling already. Outlet are installed on the wall panels, just need connect electric wires at site

 

2 workers can assemble one unit within 1 hour.

202431910310812
6384644012705935518412442

CONTACT US

    * Name

    *Email

    Phone / WhatsAPP / WeChat

    * What I have to say.


    Related Products

    The main workshop of the coal preparation plant of Huozhou Coal Electricity Group

    The main workshop of the coal preparation plant of Huozhou Coal Electricity Group

    This project is the steel structure main workshop of the coal preparation plant, which is a multi-storey frame structure and the world’s largest coking coal washing system, with a construction area of 46,000 square meters.

    Expandable container

    Expandable container

    1. Roof and floor is finished.   2. Windows and doors are preinstalled on the wall panels. &...

    Wangpo Coal Mine 80m-span Grid Truss Trestle in Jincheng

    Wangpo Coal Mine 80m-span Grid Truss Trestle in Jincheng

    The single span of this trestle project reaches 80 meters, which is the largest span among similar trestles in China. It has a double-belt and double-layer grid truss structure.

    Home
    Products
    About Us
    Contacts

    Please leave us a message

      * Name

      *Email

      Phone / WhatsAPP / WeChat

      * What I have to say.