Spherical Shell of No.1 and No.2 Coal Bunkers in the Relocation and Reconstruction Project of Tianjin Soda Plant

Project

Spherical Shell of No.1 and No.2 Coal Bunkers in the Relocation and Reconstruction Project of Tianjin Soda Plant

won the China Steel Structure Gold Award

20141126104244930

CONTACT US

    * Name

    *Email

    Phone / WhatsAPP / WeChat

    * What I have to say.


    Related Products

    A flexible and practical framework system

    A flexible and practical framework system

    The sturdy, durable, flexible and practical framework system, the China Coal Steel Structure Framework System, can provide customers with a variety of economical and practical options. It has met the requirements of various buildings for different purposes.

    Foldable Container house

    Foldable Container house

    1. Roof and floor is finished.   2. Windows and doors are preinstalled on the wall panels. &...

    Xinjiang Coal Yard Gas Membrane Shed Reconstruction Project

    Xinjiang Coal Yard Gas Membrane Shed Reconstruction Project

    Project scale: 290m in length and 110m in width   Building area: 31,900m²   Project loc...

    Shanxi Aluminum Ore Yard Enclosure Project

    Shanxi Aluminum Ore Yard Enclosure Project

    Project scale: 260m in length and 80m in width   Building area: 20,800m²   Project loca...

    BAPV standing seam colored steel sheet roofing system

    BAPV standing seam colored steel sheet roofing system

    BAVP (Building Attached PV), is a technology that installs a solar photovoltaic power generation system on the roof of an existing building. It not only has a photovoltaic power generation project but can also preserve the original building structure to the greatest extent. Advantages of BAPV Roof: There is no need to change the original roof structure. It is convenient to install and has a strong load-bearing capacity. The investment cost of some photovoltaic components is low. It has stronger heat preservation and insulation capabilities.

    Shuangchang Bulk Cargo Yard Membrane Environmental Protection Enclosure Project

    Shuangchang Bulk Cargo Yard Membrane Environmental Protection Enclosure Project

    Project scale: 320m in length and 90m in width   Building area: 28,800m²   Project loca...

    India Vicat Sagar Cement Private Limted

    India Vicat Sagar Cement Private Limted

    coal shed 76.1m width, 325m length, 25.5m height   total steel quantity reach to 3898 tons, ...

    The main workshop of the coal preparation plant of Huozhou Coal Electricity Group

    The main workshop of the coal preparation plant of Huozhou Coal Electricity Group

    This project is the steel structure main workshop of the coal preparation plant, which is a multi-storey frame structure and the world’s largest coking coal washing system, with a construction area of 46,000 square meters.

    Home
    Products
    About Us
    Contacts

    Please leave us a message

      * Name

      *Email

      Phone / WhatsAPP / WeChat

      * What I have to say.