The Professional Vehicle Joint Workshop of Xuzhou Hailunzhe Co., Ltd.

Project

The Professional Vehicle Joint Workshop of Xuzhou Hailunzhe Co., Ltd.

The Professional Vehicle Joint Workshop of Xuzhou Hailunzhe Co., Ltd.

CONTACT US

    * Name

    *Email

    Phone / WhatsAPP / WeChat

    * What I have to say.


    Related Products

    CLP voted Huolinhe 200000 tons of coal storage bunker

    CLP voted Huolinhe 200000 tons of coal storage bunker

    Inner diameter 128m, height 69m   The capacity is the biggest in Asia. The project gained Ch...

    India Vicat Sagar Cement Private Limted

    India Vicat Sagar Cement Private Limted

    coal shed 76.1m width, 325m length, 25.5m height   total steel quantity reach to 3898 tons, ...

    Xinjiang Coal Yard Gas Membrane Shed Reconstruction Project

    Xinjiang Coal Yard Gas Membrane Shed Reconstruction Project

    Project scale: 290m in length and 110m in width   Building area: 31,900m²   Project loc...

    Expandable container

    Expandable container

    1. Roof and floor is finished.   2. Windows and doors are preinstalled on the wall panels. &...

    Ground – mounted photovoltaic power station

    Ground – mounted photovoltaic power station

    Advantages of ground power plants: Large business scale enables cost reduction in equipment procurement. There are many site selection options, and new land use patterns can be continuously developed. The power quality of the ground – type grid – connected system is high, the connection is gentle, and it has little impact on the national power grid. Ground – mounted photovoltaic power plants are installed with the optimal orientation to maximize the comprehensive power generation efficiency. The power supply is centralized, stable, and of high quality, and it can regularly and continuously supply power to the power grid.

    The main workshop of the coal preparation plant of Huozhou Coal Electricity Group

    The main workshop of the coal preparation plant of Huozhou Coal Electricity Group

    This project is the steel structure main workshop of the coal preparation plant, which is a multi-storey frame structure and the world’s largest coking coal washing system, with a construction area of 46,000 square meters.

    Home
    Products
    About Us
    Contacts

    Please leave us a message

      * Name

      *Email

      Phone / WhatsAPP / WeChat

      * What I have to say.