100,000 tons of dome shed for reclaimer & stacker (R&S) of Huolinghe Coal Industry Ltd.

Project

100,000 tons of dome shed for reclaimer & stacker (R&S) of Huolinghe Coal Industry Ltd.

2

CONTACT US

    * Name

    *Email

    Phone / WhatsAPP / WeChat

    * What I have to say.


    Related Products

    India Vicat Sagar Cement Private Limted

    India Vicat Sagar Cement Private Limted

    coal shed 76.1m width, 325m length, 25.5m height   total steel quantity reach to 3898 tons, ...

    TG Building of IND-BARATH Power Plant

    TG Building of IND-BARATH Power Plant

    The project is located in the northern part of Sambalpur City, Odisha, India, with a multi – storey steel structure frame system.

    India JSW Steel Plant coal shed

    India JSW Steel Plant coal shed

    104m width, 440m length, 45m height, total steel quantity reach to 3642 tons, total area cove...

    Expandable container

    Expandable container

    1. Roof and floor is finished.   2. Windows and doors are preinstalled on the wall panels. &...

    Foldable Container house

    Foldable Container house

    1. Roof and floor is finished.   2. Windows and doors are preinstalled on the wall panels. &...

    A flexible and practical framework system

    A flexible and practical framework system

    The sturdy, durable, flexible and practical framework system, the China Coal Steel Structure Framework System, can provide customers with a variety of economical and practical options. It has met the requirements of various buildings for different purposes.

    Home
    Products
    About Us
    Contacts

    Please leave us a message

      * Name

      *Email

      Phone / WhatsAPP / WeChat

      * What I have to say.