Flat pack container

Project

Flat pack container

1. Roof and floor is finished.

 

2. Windows and doors are preinstalled on the wall panels.

 

3. Electric wires are installed in roof structure, the DB box with breakers and A/C outlet are installed on ceiling already. Outlet are installed on the wall panels, just need connect electric wires at site

 

2 workers can assemble one unit within 1 hour.

2024319102146982
6384644050200660179334505

CONTACT US

    * Name

    *Email

    Phone / WhatsAPP / WeChat

    * What I have to say.


    Related Products

    Expandable container

    Expandable container

    1. Roof and floor is finished.   2. Windows and doors are preinstalled on the wall panels. &...

    The Professional Vehicle Joint Workshop of Xuzhou Hailunzhe Co., Ltd.

    The Professional Vehicle Joint Workshop of Xuzhou Hailunzhe Co., Ltd.

    The structure type of the workshop in this project is portal rigid frame, with a construction area of 50,000 square meters. It won the Zijin Cup of Jiangsu Province in 2011.

    Wangpo Coal Mine 80m-span Grid Truss Trestle in Jincheng

    Wangpo Coal Mine 80m-span Grid Truss Trestle in Jincheng

    The single span of this trestle project reaches 80 meters, which is the largest span among similar trestles in China. It has a double-belt and double-layer grid truss structure.

    Home
    Products
    About Us
    Contacts

    Please leave us a message

      * Name

      *Email

      Phone / WhatsAPP / WeChat

      * What I have to say.